News

Engineering news and guides from IN Engineering + Planning.

When do I need to Seismic Retrofit?

When do I need to Seismic Retrofit?

The National Building Code has increased the seismic loads in the most recent revision. Eastern Ontario has some of the highest seismic loads in Canada next to the West coast. The City of Ottawa has a fault line that runs through the city and the St. Lawrence River...
Historical Engineering – Brockville’s Trinity Church

Historical Engineering – Brockville’s Trinity Church

In a recent project we paid homage to the now demolished Holy Trinity Church in Brockville, the P&G Pavilion at Rotary Park will have a small scaled down version of the old bell tower. Historical Recreation In order to make a historical recreation of the...
Carbon Emissions of the Construction Industry

Carbon Emissions of the Construction Industry

Presented to Transition Brockville 24 March 2019 On March 24, 2019 we presented to Transition Brockville about the Carbon Emissions of the Construction Industry. With recent advancements in engineered wood products and mass timber it is possible to build mid rise and...
Building Code Requirements for Radon Gas Control

Building Code Requirements for Radon Gas Control

Houses in Lanark, Leeds and Grenville (LLG) in Eastern Ontario have some of the highest concentrations of radon gas in Canada. Radon Gas is a known carcinogen  and responsible for 13.6% of lung cancer diagnosis in Canada. A Health Unit survey determined that 19.4% of...
8 Professionals You Need to Plan a Building

8 Professionals You Need to Plan a Building

In order to properly plan a building a number of different professional disciplines will be required. This list is for a typical large commercial building, for smaller buildings and homes some of these professionals aren’t required. We also created the list for...